Facilities

Facilities

PRO’s 40,000 sq ft facility is equipped with the necessary equipment to develop bench scale and pilot pre-commercialization projects in the areas of metallurgical and mineral processing as well as support incubation and commercialization initiatives by SME's.

General Information

  • Located in Sheridan Technology Park, Mississauga
  • Equipped for pilot plant and lab scale operation
  • 30’ ceiling
  • Conference Room facilities
Learn More

Ore Benefication

PRO has utilized its extensive knowledge in the efficient processing of ores utilizing our facilities in the areas of:

  • Laboratory and pilot scale ball/rod mills suited for batch and continuous process operation
  • Jaw crushers/pulverizers
  • Hazemag impact crusher
Learn More

Pyrometallurgy

PRO has good pyrometallurgical facilities capable of developing processes in areas of roasting, smelting, and pyrohydrolysis. Equipments include

  • Small scale fluid bed and tube furnaces
  • Muffle furnaces with operating temperatures up to 1200 °C
Learn More

Hydrometallurgy

PRO’s proven laboratory and pilot facilities for hydrometallurgical processing include the following:

  • Pilot continuous atmospheric leaching system
  • Bench scale titanium and pilot scale stainless steel autoclaves for high pressure leaching with capacity of up to 50 gallons
Learn More
Top